Various Streets, Vineland: Crews will be on Chestnut Avenue through Wednesday and installing gas mains Thursday and Friday on East Avenue from Chestnut Avenue to Cherry Street. Crews will be installing service lines on Grape Street and Arcadia Place all week. On Monday, they will be shifting traffic on Chestnut Avenue and also closing South Valley on both sides of Chestnut Avenue. They will have detour signs and flaggers on site. Crews will be on Wood, Pear, 2nd and 4th streets and Landis Avenue installing service lines through the week. No roads will be closed.

Source: South Jersey Gas

Pomona Road, Galloway Township: A detour will be in effect for work by NJ Transit on the railroad tracks south of Route 30 through 5 p.m. Wednesday. Motorists will be directed to Genoa Avenue. Minor delays may be experienced.

Source: Atlantic County government

Route 30, Galloway Township: Construction at Pomona Road will result in lane shifts to the right. Traffic will be reduced to one lane in each direction during off-peak hours west of Rosemarie Avenue. Traffic will be reduced to one lane at all times between Xanthus and Augustus avenues.

Route 206, Hammonton: Resurfacing is taking place between Route 30 and the Burlington County border. Work will be done at off-peak hours, and signs will be posted regarding changes to traffic patterns.

Beach Thorofare bridge, Atlantic City: A series of Route 30 closings are in place to complete the installation of new safety barrier gates on the Route 30/Absecon Boulevard Bridge. The state Department of Transportation will be closing Route 30 in either direction overnight, between 8 p.m. and 7 a.m., to install new safety barrier gates on both sides of the movable bridge. The following week, Oct. 15-19, the state DOT will enact periodic full closings of Route 30 in both directions between 9 a.m. and 3 p.m. daily for system testing of the new barrier gates. Full closings will be limited to 15 minutes at a time.

Route 9, Tuckerton and Eagleswood Township: Construction will take place on Route 9 in both directions between Great Bay Boulevard in Tuckerton and north of Stafford Forge Road in Eagleswood Township. Traffic shift until Dec. 30.

Source: State Department of Transportation

Atlantic City Expressway, Hamilton Township: Lane shifts will be in effect due to long-term construction of a third lane between the Frank S. Farley Service Plaza and east of Exit 28. Speed limit is reduced to 45 mph.

Route 322, Hamilton Township: Lane shifts will be in effect until Dec. 10 in both directions in the vicinity of Taminen Road for construction.

Source: 511NJ.org

Lake Pohatcong Dam, Tuckerton: Lane shifts, shoulder closings and alternating traffic patterns will take place during reconstruction of the dam until further notice.

Routes 72 and 539, Barnegat and Stafford townships: Shoulder closings and lane shifts will take place for westbound shoulder widening until further notice.

Source: Ocean County government